Port Hope Area Initiative Says Work Half Way Done On Mill Street Site

In Local, Photo Gallery

Work continues on the Mill Street site in Port Hope which is being remediated as part the Port hope Area Initiative. It includes the removal of contaminated fill and trucking the soil along the dedicated haul route to the new long-term waste management facility, said spokesperson Bill Daly. Water management of the site, which is at Port Hope’s waterfront, has been ongoing and effective.


Old contaminated building materials have been taken to the long-term waste management facility, and where possible, structures have been donated.


The work at the site is about half-way complete, with restoration planned for 2022.

Pete Fisher
Author: Pete Fisher

Has been a photojournalist for over 30-years and have been honoured to win numerous awards for photography and writing over the years. Best selling author for the book Highway of Heroes - True Patriot Love

Join Our Newsletter!

Want to keep up to date on news and events in Northumberland? Subscribe to newsletter!

You may also read!

Video – Photo Gallery – A Beautiful Evening Along Cobourg’s Waterfront

https://www.youtube.com/watch?v=PH-zP_iihQE With summer quickly drawing to a close, Cobourg’s waterfront offered a picture-perfect evening to enjoy the pier, the lake

Read More...

Cobourg Mayor Says “Enough is Enough” After Woman Steps on Needle at Cobourg Beach

(Today's Northumberland file photo) Cobourg Mayor Lucas Cleveland says an incident that left a local woman facing a $1,300 medical

Read More...

In My Opinion: A Day at “Our” Beach Turns Into a Nightmare

(Today's Northumberland file photo) There is something profoundly wrong when a family can go to Victoria Beach for a day

Read More...

Mobile Sliding Menu