Video – Construction Continues on Trent Port Marina Breakwater Replacement

In Local

Work continues on the replacement project of a new breakwater system being installed by the Trent Port Marina in Trenton.

On Friday, March 14,  2025 work was taking place along the Trent River, just south of the Trent Bridge.

The existing breakwaters are being replaced with floating steel box breakwaters with the work expected to be completed by April 2025.

The floating steel box breakwaters are designed to withstand waves, along with protecting marina infrastructure.

The new breakwater system cost just under six-million dollars and has an expected lifespan of 40 years.

 

Pete Fisher
Author: Pete Fisher

Has been a photojournalist for over 30-years and have been honoured to win numerous awards for photography and writing over the years. Best selling author for the book Highway of Heroes - True Patriot Love

You may also read!

Exclusive – Potential Ambulance Service Reductions in Peterborough County Could Impact Northumberland County

Potential reductions in ambulance services in Peterborough County during a labour dispute could result in increased demands on neighbouring

Read More...

Video – Photo Gallery – 598 Sabre Squadron Cadets Stand Vigil at Cobourg Cenotaph Ahead of Remembrance Day

https://www.youtube.com/watch?v=Pc_LqbYhs24 Approximately 25 members of the 598 Sabre Squadron Royal Canadian Air Cadets took part in a solemn vigil at

Read More...

Peterborough County – Essential Ambulance Services Agreement Reached

The County and CUPE Local 4911 signed an Essential Ambulance Services Agreement (EASA) on Friday, November 6. The EASA sets

Read More...

Mobile Sliding Menu