Video – Construction Continues on Trent Port Marina Breakwater Replacement

In Local

Work continues on the replacement project of a new breakwater system being installed by the Trent Port Marina in Trenton.

On Friday, March 14,  2025 work was taking place along the Trent River, just south of the Trent Bridge.

The existing breakwaters are being replaced with floating steel box breakwaters with the work expected to be completed by April 2025.

The floating steel box breakwaters are designed to withstand waves, along with protecting marina infrastructure.

The new breakwater system cost just under six-million dollars and has an expected lifespan of 40 years.

 

Pete Fisher
Author: Pete Fisher

Has been a photojournalist for over 30-years and have been honoured to win numerous awards for photography and writing over the years. Best selling author for the book Highway of Heroes - True Patriot Love

Join Our Newsletter!

Want to keep up to date on news and events in Northumberland? Subscribe to newsletter!

You may also read!

Video – First Heavy Rain of the Season Causes Minor Flooding in Area

https://www.youtube.com/watch?v=dciOyBpgViU The first rain storm of the year caused minor flooding in the area on Sunday, March 16, 2025. The deluge

Read More...

Video – Transport Truck Rolls Into Ditch on Highway 401 West of Cobourg

https://www.youtube.com/watch?v=6R5QQ7u0UBI There were no injuries after transport flipped over on Highway 401 west of Cobourg on Monday, March 17, 2024. Shortly

Read More...

Peterborough Police – Incidents Include RIDE Program, Impaired Arrests (No Names Released

Calls for Service: (Mar 14 at 8:00am – Mar 15 at 8:00am) 98 (Mar 15 at 8:00am – Mar 16 at

Read More...

Mobile Sliding Menu