Port Hope – Highway 401 Maintenance

Construction Maintenance on Highway 401 Choate Road Overpass

Residents are advised that the Ministry of Transportation will be completing construction maintenance on the Highway 401 Choate Road overpass.

The intended start time is September 3, 2019 for a duration ending December 31, 2019, with an option to extend should it be required. The local traffic impact will include lane closures with intermittent traffic holds to allow for safe travel through the project space in both directions. The project space will be limited to the area under and adjacent to the underpass and will allow traffic to enter and exit McKibbon Street.

Questions or concerns can be directed to Amy Bronkhorst in the Works and Engineering Department at abronkhorst@porthope.ca

Author: Pete Fisher

Has been a photojournalist for over 30-years and have been honoured to win numerous awards for photography and writing over the years. Best selling author for the book Highway of Heroes - True Patriot Love

Exit mobile version